Alte Brauakademie / Main construction work
Site installation for contractor: 1 lump sum Tower crane system, incl. foundation: 1 pc. Edge protection for wall openings, elevator portals: 22 m Edge protection for stair flights and slab edges: 82 m Elevator installation platforms: 7 pcs. Excavation shoring as soldier pile wall: 164 m2 Shoring piles, anchored, l=4.80m: 3 pcs. Remove topsoil layer, transport to contractor's staging area, stockpile: 60 m3 Dispose of topsoil up to LVGBT Z 1.1: 90 to Remove topsoil homogeneous area A, OU UL, transport to contractor's staging area, stockpile: 140 m3 Dispose of topsoil homogeneous area A, OU UL, up to LVGBT Z 1.1: