Main quantities: Section 1 Site installation Section 2 Excavation with stockpile formation and removal approx. 200 m³ Installation of frost-free material 1,500 m³ Section 2.2 Dewatering Section 3 Reinforced concrete works Floor slab 350 m³ Walls 520 m³ Ceilings 450 m³ Reinforcement structural steel 220 t Section 3.4 Prefabricated parts Stairs basement up to 2nd floor 2 units Light well Section 4 Insulation 1,200 m² Section 5 Masonry and plastering works Section 6.1 Cable protection tubes approx. 1,000 m Ring earth conductor 400 m Section 6.2 Foundation pipes approx. 300 m Section 7 HVAC Section 8 Hourly wage work