HVAC installations + pellet boiler
ewz operates the Hardau heating network in Zurich city district 4. Due to the increasing capacity and energy demand in the Hardau heating network, an expansion of the Bullingerstrasse 39 energy centre is required in order to continue to guarantee the contractually owed fossil-free coverage rate in the future. A third heat pump (air/water) with approx. 1.5 MW and two pellet boilers with a total heating output of 3 MW are planned. An extension building will be constructed on the northeast side of the existing building for this purpose. The new pellet boilers will be installed in the above-ground part, and the pellet storage in the basement