Restructuring of the Fontaines sur Saône WWTP and its connection to the Pierre Bénite catchment area - 6 Lots Lot 3: Neuville social facilities
This contract includes the construction of social facilities within the perimeter of the current Neuville-sur-Saône wastewater treatment plant for the operating team and the process team with the modification and extension of the existing building for the creation of offices, the rearrangement of the supervision room and distribution areas, and the expansion of the locker rooms and the refectory, as well as the creation of workshop and storage rooms on the ground floor, a mixed green roof and outdoor storage with shade structures and photovoltaic panels. This contract is part of the restructuring operation
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Restructuration de la STEP de Fontaines sur Saône et son raccordement au bassin versant de Pierre Bénite - 6 Lots Lot 3 : Locaux sociaux de Neuville