Renovation of the Theodor Eckert primary school with new construction of a triple sports hall
The Theodor Eckert primary school is divided into 3 construction areas. New construction of the sports hall, new construction of the school, and existing school. The existing school has been completely gutted by the contractor and is being completely rebuilt. Heat generation is provided via heat pump technology and geothermal probes. Heating energy is generated exclusively via a heat pump with approx. 250KW with geothermal probes under the sports hall as a heat source. Regeneration in the ground is carried out by a dry cooler on the roof or via cooling operation in summer. For the hot water supply of the triple sports hall, booster heat with approx. 80 KW is used.D