Metrovalencia tram network renovation works. Phase 1. Line 4, 6, and 8 Metrovalencia (FGV). Municipality of València and Burjassot (València).
The Metrovalencia tram network inaugurated its first section in 1994, with València being the first city to reintroduce this transport system. The current tram network has the following lines and sections: Line 4, Line 6, Line 8, and Line 10. Some of the sections have been in service for almost 30 years, and certain problems in the track infrastructure and superstructure have been identified that need to be corrected. Specifically, rail wear, track switch wear, defects in the surface finish of the platform, defects at level crossings and on the platform shared with buses, defe
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Obras de renovación de la red tranviaria de Metrovalencia. Fase 1. Línea 4, 6 y 8 Metrovalencia (FGV). T.M. València y Burjassot (València).