S1 Vienna Outer Ring Expressway 1.VA Groß-Enzersdorf - Süßenbrunn - Construction Lot 1.1 - Main Construction Lot
S1 Vienna Outer Ring Expressway 1.VA Groß-Enzersdorf - Süßenbrunn Construction Lot 1.1 - Main Construction Lot. The lot essentially includes: • Construction of the S1 1.VA route between km 25.425‑km 35.550 (earth and road works, drainage, noise protection, etc.) • Construction roads and side paths (earth and road works, drainage, etc.) • Construction of 8 pump and lift stations including switching houses and a discharge channel into the Russbach • Construction of 8 pump distribution buildings • Construction of S1 bridge structures (S1.Ü16, S1.Ü17, S1.Ü18, S1.Ü19, S1.Ü20, S1.Ü21, S1.Ü22, S1.Ü23, S1.Ü24, S1.Ü25, S1).
Translated automatically from the original language, so check the official notice for the exact wording. Original title: S1 Wiener Außenring Schnellstraße 1.VA Groß-Enzersdorf - Süßenbrunn - Baulos 1.1 - Hauptbaulos