Project 23.558/1 & STK3010 - Stekene, Optimization of connecting sewerage Hellestraat
Project 23.558/1 & STK3010 - Stekene, Optimization of connecting sewerage Hellestraat. This assignment specifically includes: • preparatory breaking works of existing paving and sewerage with connections. • construction of semi-separate sewerage with house connections and street inlets. ❖ pipes di 250 : 763 m ❖ pipes di 300 : 366 m ❖ pipes di 315 : 12 m ❖ pipes di 400 : 1,801 m ❖ pipes di 500 : 430 m ❖ pipes di 600 : 1,261 m ❖ pipes di 700 : 513 m ❖ pipes di 800 : 45 m • installation of pressure sewerage in polyethylene ❖ Pipes du 63 : 14 m ❖ Pipes du 75 : 242 m • installation of force mai
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Project 23.558/1 & STK3010 - Stekene, Optimalisatie verbindingsriolering Hellestraat