Design and construction of the S11 Piła-Poznań expressway, section Ujście – Oborniki, section I Ujście – Budzyń junction (with junction)
The subject of the contract is the design and construction of the S11 expressway on the section from km 0+000 to approx. km 19+430 (border of plots 184 and 185, poviat: Chodzież, gmina: Budzyń, precinct Wyszyny) along with the connection of the S11 road section to the existing DK11 road (on the section from km 18+000 to km 18+783.01 according to the km from the STEŚ S11 Piła – Ujście study). The beginning of the subject section constitutes the connection to the dual-carriageway cross-section of the designed S11 road on the Piła – Ujście section and inclusion into the existing DK11 using design solutions for the "Ujście" junction. The end of the subject section