Brno Railway Node, Heršpice and Passenger Station Phase
Subject of public procurement performance: a) Cooperation in the preparation of the EIA Documentation, including cooperation and preparation of background materials for the EIA Documentation processor specified in Article 4.15 of the Tender Documentation (ZTP), coordination of the technical design with the outputs and recommendations of the EIA Documentation, and incorporation of the conclusions of the EIA process into the Project Documentation for the Transport Infrastructure Construction Permit (DPS). b) Production of the Project Documentation for the Transport Infrastructure Construction Permit (DPS) in BIM mode, which specifies the subject of the Work to such an extent that it can be negotiated in the intention permit procedure and a final intention permit can be obtained
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Železniční uzel Brno, etapa Heršpice a Osobní nádraží