Marie Curie Gymnasium Hohen Neuendorf - Extension of gymnasium and cafeteria: Lot 13 - Flooring work
The construction project involves the new extension of the Marie-Curie-Gymnasium in 16540 Hohen Neuendorf. The building is directly adjacent to the existing building, has a partial basement, and has three floors above ground (ground floor - 2nd upper floor). The net floor area is approx. 1,670 m², and the gross volume is approx. 7,000 m³. The new extension will be built using reinforced concrete construction (mixed construction: prefabricated, semi-prefabricated, and cast-in-place concrete) with an ETICS facade. Within the scope of the structural shell work, there are minor interventions in the cafeteria of the existing building. School operations must be maintained during the entire construction work
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Marie-Curie-Gymnasium Hohen Neuendorf - Erweiterung Gymnasium und Cafeteria: Los 13 - Bodenbelagsarbeiten