Shell construction, earthworks, demolition
Demolition work: Cement screed, floating, d = 60-80 mm, break out and dispose of 100 m2 Windows, 10-piece, dismantle and dispose of, wood, approx. 2.50 x 3.00 m 4 pcs Remove concrete pavers from courtyard areas, up to 10 cm 1,385 m2 Earthworks: Loosen soil for excavation pit, load, dispose of at approved landfill, depth over 1.00 m to 1.50 m 2,085 m3 Drainage work: Demolition of existing drainage pipes SW / RW, stoneware or PVC/PP plastic, depth = up to 1.8 m or 3.0 m 160 m PP pipe DN 100 – DN 300 335 m Concrete work: Floor slab, C25/30, XC1, XC2-WF, d = 25 cm, cast-in-place concrete 1,150 m2 Reinforced concrete interior wall, elevator shaft, C25/30, XC1
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Rohbau, Erdbau, Abbruch