Investment activities in the field of construction of the Energy Cluster infrastructure Energia Południa - hydrogen installation
The contract consists of the design, delivery, assembly, and commissioning of a hydrogen installation cooperating with the existing photovoltaic installation of the Ordering Party – Gmina Gnojnik, located at the Wastewater Treatment Plant in Gnojnik. The detailed scope of obligations to be performed by the Contractor is described in the Project Technical Documentation (Description of the Subject of the Contract), which constitutes the PFU - Construction of RES installation in Gmina Gnojnik - hydrogen installation (Annex no. 1 to the SWZ) and in the Draft contract provisions (Annex no. 2 to the SWZ), which are an integral part of the SWZ
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Działania inwestycyjne w zakresie budowy infrastruktury Klastra Energii Energia Południa -instalacja wodorowa