Increasing energy production from renewable sources in the City of Brzeziny – Stage III.
1. The subject of the contract is the preparation of simplified design documentation, and then based on it, the delivery, installation and commissioning of photovoltaic installations with a total capacity of min. 0.616 MW for 100 households in the city of Brzeziny, equipped with electrical energy storage facilities with a total capacity of min. 1.065 MWh, in accordance with the functional and utility program, constituting Appendix No. 10 to the ToR. 2. Built-in devices must have EU declarations of conformity (CE marking) and meet the requirements of the RoHS directive (in terms of its application) concerning the restriction of hazardous substances
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Zwiększenie produkcji energii ze źródeł odnawialnych na terenie Miasta Brzeziny – Etap III.