Repair of road III/4733 Pazderna Žermanice, section 3 SO 103 + VRN
The subject of the public contract is the conclusion of a works contract with a single supplier for the execution of construction works on road III/4733 in section 3, i.e. SO 103 at km 7.660‑8.350 between the municipalities of Pazderna and Žermanice. The total length of the section to be repaired is 690 m. The maximum construction period is set at 60 calendar days (the minimum construction period is set at 42 calendar days) – the duration of the construction works is subject to evaluation. The place of performance is road III/4735 (parcels no. 567, 561/2, 566, 558 in the cadastral unit Žermanice).
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Oprava silnice III/4733 Pazderna Žermanice, 3.úsek SO 103 + VRN