School farm at the Agricultural School, Čínov - 1st stage (cowshed, mini-dairy, milking parlor)
SO 02 Milking parlor, mini-dairy The milking parlor building has a rectangular floor plan. The layout is divided into 2 main parts – the milking parlor and the dairy, which are equipped with the necessary technologies for milk processing. The building has one above-ground and one underground floor. The underground floor houses sanitary facilities for employees. The building is connected by a corridor to the neighboring cowshed building. It is used to transport cattle to the dairy for disinfection or when it is necessary to transport an animal to a vehicle for a trip to veterinary treatment. A milk storage tank with a capacity of 12,000 liters is installed at the building. SO 03 Cowshed
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Školní farma na Zemědělce, Čínov - 1. etapa (kravín, minimlékárna, dojírna)