M26-13 Drafting of regulatory files and project management mission (MOE) for the extension of the non-hazardous waste storage facility (ISDND) of Le Poyet in Ambert (63)
VALTOM is planning to extend the Ambert ISDND within the current ICPE perimeter and on plots adjoining the current site. The contract covers the preparation and monitoring of the environmental authorization application file (DDAE), followed by the project management of the selected project and the preparation of the work conformity file up to the authorization to open the cell. The contract is divided into 1 firm tranche and 2 optional tranches
Translated automatically from the original language, so check the official notice for the exact wording. Original title: M26-13 Rédaction des dossiers réglementaires et mission de maîtrise d'oeuvre (MOE) pour la prolongation de l'installation de stockage de déchets non dangereux (ISDND) du Poyet à Ambert (63)