Delivery of 220 kV cable systems together with the preparation of the construction design and obtaining the building permit for the 220 kV Ełk Bis – State Border line as part of the project "Interconnection between Poland and Lithuania (currently known as Harmony Link) together with the connection o
1. The subject of the order is the delivery of 220 kV cable systems together with the preparation of the construction design and obtaining the building permit for the 220 kV Ełk Bis – State Border line as part of the project "Interconnection between Poland and Lithuania (currently known as Harmony Link) together with the connection of the Suwałki Special Economic Zone". The subject of the order has been divided into 3 Packages/Parts, i.e.: Package/Part 1 - Package A. Package/Part 2 - Package B. Package/Part 3 - Package C. Each Contractor may submit an offer for one or more Packages/Parts of the order, the maximum number of Packages
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Dostawa systemów kablowych 220 kV wraz z opracowaniem projektu budowlanego i pozyskaniem pozwolenia na budowę dla linii 220 kV Ełk Bis – Granica RP w ramach projektu „Połączenia międzysystemowego między Polską a Litwą (obecnie znane jako Harmony Link) wraz z przyłączeniem Suwalskiej Specjalnej Strefy Ekonomicznej