Wastewater treatment plant, network, road construction in Dabas
Task: development of the wastewater collection and treatment system of the town of Dabas within the framework of a works contract, conducting a trial run of at least 6 months, and performing tasks falling within the scope of the warranty during the warranty period. The execution plans for the wastewater treatment plant and network development to be established have been prepared within the framework of the KEHOP-2.1.3-15-2022-00105 grant agreement, therefore the contract structure according to the FIDIC "Red" Book is applied. A preliminary examination procedure was required for the entire investment, which concluded with a decision (PE/KTHF/00172-15/2024. - environmental impact assessment conducted
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Szennyvíztisztító telep, hálózat, útépítés Dabason