Dismantling and earthworks
- General site installation - Site installation for hazardous waste disposal - Dismantling and disposal of uncontaminated interior components - Dismantling and disposal of standard asbestos-containing building materials or components - Dismantling and disposal of standard components with respirable MMMF - Fine cleaning - Total demolition of the existing building, approx. 861 m³ building volume - Crushing of demolition material using a small crushing plant to be provided - Removal of concrete block paving, shrubs, etc. in the outdoor facilities - Excavating, loading, and storing 125 m³ of topsoil - Excavating, loading, and storing 1,800 m³ of topsoil (sand) - Declaration of un