Construction of Manilla pier and street renovation of Itäinen rantakatu between Tervahovinkatu and Purserinpolku (re-tendering)
The contract is a fixed-price total contract containing unit-price parts. The existing wooden pier of Manilla will be demolished and replaced by a new concrete river wall, raising the shore strip to the current street level. The existing pontoon pier in front of the wooden pier will be moved back to its original location at Sotalaisenkatu. The surface structures and equipment of the pier will be restored as part of the procurement. The river-facing surface of the new concrete river wall will be clad with a work of art. The fixed gangway solutions of the river wall for the future pontoon pier are included in the contract. Floating piers
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Manillan laiturin rakentaminen ja Itäisen rantakadun katusaneeraus välillä Tervahovinkatu - Purserinpolku (uudelleen kilpailutus)