Design and execution of works for the project: "Installation of the ERTMS/ETCS level 2 system on railway lines no. 133 and 91, section Kraków Główny – Podłęże" as part of the "Installation of the ERTMS system" project.
1. Implementation of the task entitled "Installation of the ERTMS/ETCS level 2 system on railway lines no. 133 and 91, section Kraków Główny - Podłęże" will be carried out under the "design and build" system based on the Conditions of Contract. The scope of the contract includes the execution of: 1) preliminary documentation consisting of: Design concept (line equipment concept); Principles of preparing design data; Operational scenarios; Railway Traffic Management Principles (Update of the Instruction on train traffic management using the ERTMS/ETCS level 2 system Ir-1b); Test cases; 2) documentation
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Zaprojektowanie i wykonanie robót dla zadania pn.: „Zabudowa systemu ERTMS/ETCS poziomu 2 na liniach kolejowych nr 133 i 91 odc. Kraków Główny – Podłęże” w ramach projektu „Zabudowa systemu ERTMS”.