Works contract for the demolition and reconstruction of plastic arts and music rooms with the creation of a courtyard canopy at Célimène Gaudieux secondary school in La Saline – Municipality of Saint-Paul
The purpose of this contract is: The demolition of the former Arts and Music rooms and their reconstruction (4 rooms and their storage areas); The construction of a new building with a footprint of 410 m², on ground floor plus 1 upper floor, including the creation of 3 additional general-purpose classrooms for the educational needs of the establishment; The layout of the future building featuring a ground floor and a first floor accessed by an open-air straight concrete staircase; The operation also includes the creation of a second 150 m² courtyard canopy at the lower courtyard level of the establishment.
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Marché de Travaux de démolition et de reconstruction des salles d’arts plastiques et de musique avec création d’un préau au collège Célimène Gaudieux à la Saline – Commune de Saint-Paul