Hydraulic structure reinforcement works for the APRR, AREA, ADELAC and ALIAE networks
Work order-form framework agreements concluded with a single contractor per geographical lot, concerning hydraulic structure reinforcement works on the APRR/AREA/ALIAE/ADELAC motorway network. These works mainly concern: - The reinforcement of hydraulic structures (with a diameter between 300 and 2000mm) using the following techniques (lining with prefabricated GRP shells, lining with a polymerizable fiberglass liner, lining with a polymerizable felt liner) - The construction of small civil engineering works related to the reinforcement works, -
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Travaux de renforcement des Ouvrages Hydrauliques pour les réseaux APRR, AREA, ADELAC et ALIAE